Posted: February 15th, 2015
Paper, Order, or Assignment Requirements
You only need to do the individual A3 Detail Drawing 5 – Header Tank or Inlet Works for HEP scheme. You will draw in AutoCAD
but the requirement is to submit a pdf of a CAD drawing.Other requirements in the attachments.
Place an order in 3 easy steps. Takes less than 5 mins.