Construction

The Constructionarium is a hands-on construction experience for students and young professionals. It is where students following civil engineering or building courses learn practically to build bridges with industry – their future employers. The basic model consists of a “triangle” formed by a university, contractor and consultant working in partnership to deliver a new learning experience, which combines the academic perspective with those of the design professional and practical site delivery

 Construction Project: Based on the Constructionarium Field Trip 22nd– 27th March 2015 Bircham Newton, Norfolk. Submission as follows: Student going on the field trip MUST attend all the preparation class sessions. Background This assignment is worth 70% of the Module and is based around the preparation work for the optional field course at Constructionarium to […]

Read full post

Date: March 2nd, 2015

A descriptive method statement of how the project will be built, including details / diagrams of all temporary works and formwork fabrication required

 Construction Project: Based on the Constructionarium Field Trip 22nd– 27th March 2015 Bircham Newton, Norfolk. Submission as follows: Student going on the field trip MUST attend all the preparation class sessions. Background This assignment is worth 70% of the Module and is based around the preparation work for the optional field course at Constructionarium to […]

Read full post

Date: March 2nd, 2015

Construction Project: Based on the Constructionarium Field Trip 22nd- 27th March 2015 Bircham Newton, Norfolk

 Construction Project: Based on the Constructionarium Field Trip 22nd– 27th March 2015 Bircham Newton, Norfolk. Submission as follows: Student going on the field trip MUST attend all the preparation class sessions. Background This assignment is worth 70% of the Module and is based around the preparation work for the optional field course at Constructionarium to […]

Read full post

Date: March 2nd, 2015

The task is a professional style report, referenced appropriately, relating to the contractual remedies and practical solutions which may be available to the project team in the event of a substantial delay which has caused a dispute in terms of the way in which this has been assessed by the Employer's team.

A few pointers   The task is a professional style report, referenced appropriately, relating to the contractual remedies and practical solutions which may be available to the project team in the event of a substantial delay which has caused a dispute in terms of the way in which this has been assessed by the Employer’s […]

Read full post

Date: March 1st, 2015

Live Chat+1-631-333-0101EmailWhatsApp