Posted: November 26th, 2014

Construction Project Management

Construction Project Management

Project description
Read all the assignment brief. MUST USE MS PROJECT. Use link in assignment.

1. BRIEF
This work is to be carried out individually, both tasks to be completed by all students. Part A and Part B have equal marks allocated. Part A: The subject development relates to the construction of 18 timber framed homes in Manchester, see details in the appendix below and at URL:
http://www.hdawards.orq/archive/2011/winninq schemes/project winners/new is  lington.php
Produce a production method statement for the construction of the 18 houses, see below and the appendix for details. The method statement should contain all construction process matters and should have a strong emphasis on health and safety, environmental concerns and innovative production processes. A cost for the houses is not required. The method statement should not be a site health and safety plan and it should not be a site waste management plan, however it may make reference to these two documents.
The method statement should be in written report form; however it may contain sketches, calculations and other techniques for explaining the method of operations. Research should be carried out on best production practices and Harvard referencing should be used to cite all sources. The word count for the method statement should be 3000 plus or minus 200 words.
1

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Live Chat+1-631-333-0101EmailWhatsApp