Posted: September 13th, 2017

Cost-Benefit Analysis

Paper, Order, or Assignment Requirements

 

 


In doing the following exercise, please refer to the discussion in pages 319–333 of Chapter 7 from Mikesell’s Fiscal Administration on cost-benefit and cost-effectiveness analysis. Cost-benefit analysis is a technique that assumes all costs and benefits can have a dollar value attached to them. It is a tool and should not be used as the sole basis for decision making. The result of a calculation is a ratio between costs and benefits. After all other calculations have been made, the analysis needs to conclude with the calculation of the ratio between costs and benefits. If the ratio costs exceed benefits, the project advice is to not accept the project and to consider accepting the project if benefits exceed costs. Consider the following example from the fictitious Swobodaville’s efforts to build a Community Windmill Renewable Energy Project. The following has been agreed upon:
Land is already owned. The price of a new is windmill is $150,000. A minimum of 50 windmills are needed to achieve desired efficiency compared to the current coal-burning method.
Staff training costs over three years when considering direct costs, including loss of productive hours while in training, will be $55,000 for each of the 10 specialists to be hired.
The annual operating and maintenance costs of the machine in the three-year period will be $35,000 per windmill.
The cost of shutting down a portion of the coal plant to achieve the same energy production as the windmills is $1,000,000.
There will be a decrease in staff productivity compared to coal-burning operations. This was calculated based on the 10 specialized staff members’ average hourly rate of $55 and the number of hours added over the three year-period, 450. Three current coal plant workers who will lose their jobs is three at a wage of $35 per hour.
As a widely supported community project with an investment in every aspect of the community’s well being, quality of life expected from reductions in pollution is considered in the cost calculation. The medical center that conducted an analysis has concluded that the value of increased life expectancy should be included as a benefit to the community. The quality of life of 5,000 residents is expected to be increased by an average of dollars over three years. The average benefit of a resident (including all men, women, and children) over a three-year period is estimated to be $1,500.
The three-year savings on other pollution damage to buildings and grounds, calculated by the Sierra Club, is $7,000,000. 
Scenario 2 tasks:
Calculate the cost-benefit ratio.
Explain whether the ratio is positive or negative.
If positive, explain if you would replace a portion of the coal-burning operation or the whole operation? Why or why not? 
Support your Assignment with specific references to all resources used in its preparation. 

Resources provided:

Mikesell, J. L. (2014). Fiscal administration: Analysis and applications for the public sector (9th ed.). Boston, MA: Wadsworth.

Friedman, M. (n.d.). The inflation calculator. Retrieved from http://www.westegg.com/inflation/

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Live Chat+1-631-333-0101EmailWhatsApp