Posted: September 16th, 2017
Use Visio for one of the pages
Write a two page paper in which you:
Create a graphic rendering of the critical path for your project using Visio or its open source alternative software. Note: The graphically depicted solution is not included in the required page
length.
Write a memo to the project team that includes the following:
Describe in words the critical path you have rendered graphically.
Explain what factors could cause deviation from the critical path.
Explain the results of deviating from the critical path.
Describe the triple constraints of a project.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor
for any additional instructions.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in Visio or Dia. The completed diagrams / charts must be imported into the Word document before the paper is submitted.
The specific course learning outcomes associated with this assignment are:
Design high-level logical system characteristics (user interface design, design of data and information requirements).
Analyze and present methods to initiate, specify, and prioritize information systems projects and determine various aspects of feasibility of these projects.
Develop a solution to proposed business problem using structured systems analysis and design methods.
Use technology and information resources to research issues in advanced systems analysis and design.
Write clearly and concisely about advanced systems analysis and design using proper writing mechanics and technical style
conventions.
Place an order in 3 easy steps. Takes less than 5 mins.