Posted: March 24th, 2017
Given the attached list of fixed, variable, and semi variable costs, please help me explore the possibility of altering the cost behavior of two cost components. I need to come up with a way to change a variable cost to a fixed cost, or a fixed to variable, semi to fixed. I need two examples.
Place an order in 3 easy steps. Takes less than 5 mins.