Posted: September 5th, 2015
Optimizing and de-emphazise of Policy/procedures/process in Beaumont Care.
Description of project
Connecting the process manual, medication framework, infection control framework and practice protocols and to map the current documents and streamline into one system.
Place an order in 3 easy steps. Takes less than 5 mins.