PRM301 Introduction to Project Management

Project Execution and Control

Case Assignment

The Manhattan Project was unique in at least one respect; a major industrial enterprise was built in support of a totally new, untested product – one that it may not have been possible to build. Although scientists knew that heavy atoms like uranium spontaneously disintegrated, producing energetic radiation, it was by no means certain that the process could be scaled up to produce an explosion. The only way to find out was to try – and the only way to try was to first separate kilograms of U235 from tons of U238. (A parallel project was aimed at producing fissionable plutonium; both proceeded in parallel, because it was by no means certain that either project would succeed.)

The massive work of uranium separation and plutonium production took place concurrently with basic scientific research and technical weapons design. The first employed thousands of workers, most of them laborers with no scientific background whatsoever. The second employed hundreds of the greatest scientific minds of the day, including (in a supporting role) Albert Einstein.

The production work and the theoretical work required vastly different control mechanisms. The greatest need on the production side was secrecy. The mere fact that the United States had made uranium separation a high national priority would tell scientists in other countries much more than the American government wanted them to know. The greatest need on theoretical side was the free exchange of information among the scientists. If Physicist A wanted to discuss an idea with Physicist B, he wanted to talk to him directly – not draft a report, to be read, classified, and hand-delivered by Military Intelligence.

The solution was to create two entirely different organizations within the Manhattan Project; one managed by military officers, the second by a distinguished, charismatic physicist.

Q1: What were the organizations?

Q2: Who were the managers? How well were they suited to their jobs?

Based upon your detailed knowledge of modern project management techniques,

Q3: Could the control problems have been anticipated?

Q4: What, if anything, should have been done differently at the beginning of the Manhattan Project?

At the risk of giving too much away, we should note that one of the organizations still exists: Los Alamos National Laboratory of the US Department of Energy. Feel free to visit the website. No scientific organization in the world has a more interesting history, or a more distinguished pedigree.

BACKGROUND MATERIAL

AJ (2015). The Manhattan Project: Making the atomic bomb. (Index page. See the entire site.) Retrieved August 10, 2009 from http://www.atomicarchive.com/History/mp/index.shtml

NY Guide (2002c). Management’s Guide to Project Success. (Execution and control: Sec. 3.4) Retrieved from the New York State Chief Information Officer/Office for Technology’s Enterprise Program Management Office, June 6, 2009.

Wideman, M. (2015b). Project management case study: The Custom Woodworking Company – Woody 2000 project. Retrieved on 7 Feb 2015 from http://www.maxwideman.com/papers/woody2000/intro.htm

Additional Sources

Hooke, F. (2013). The hidden cost of poor project management (Introductions – also see the linked pages.) Retrieved on 7 Feb 2015 http://www.maxwideman.com/guests/hidden/intro.htm

RoC (2008c). Public Procurement Best Practices Guide, (Execution and control: Chap. 7.5). Treasury of the Procurement Directorate of the Treasury of the Republic of Cyprus.. Retrieved August 10, 2009 from http://www.publicprocurementguides.treasury.gov.cy/OHS-EN/HTML/index.html?7_project_management.htm

Order a unique copy of this paper
(550 words)

Approximate price: $22

Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency

Order your paper today and save 10% with the discount code HDCOVID10