Posted: September 17th, 2017

Project Management

Project Management

Free Online OCR

Home
OCR API
Contact us

Free Online OCR Convert JPEG, PNG, GIF, BMP, TIFF, PDF, DjVu to Text

Select pages from 1 to 2
Recognition language(s) (you can select multiple)

Rotate image 0° CCW 90° 180° CW 90°
Page layout analysis – split multi-column text into columns
Page
of 2

Download
Copy to Clipboard
Google Translate
Bing Translator
Paste Online
Edit Online

r x i INSTITIUID TEICNEOLAIOCHTA NA GAILLIMHE-MAIGH Eo
g GALWAY-MAYO INSTITUTE or TECHNOLOGY
DEPARTMENT OF BUILDING AND CIVIL ENGINEERING
Bachelor of Engineering (Hons) Civil Eng Year 4 2014/2015
PROJECT MANAGEMENT
REPORT FOR AUTUMN 2015
You are required to identify a substantial building or civil engineering project for which you
can access information. The project must have a minimum value of €5m (or equivalent in
local currency) and be currently under construction or very recently completed. You must
submit details of the project to John Hanahoe and not proceed without receiving approval.
You are required to produce a detailed report on the management approach and
management systems used for the chosen building or civil engineering project. The report
should be a minimum of 5,000 words (not including appendices) and address the following
1. The purpose, scope and extent of the building or civil engineering project including
the estimated construction cost, project duration and key milestones
2. The project contractual arrangement(s) and organisational structure(s) to include the
role of the client, the designer(s) and the construction team and their
interrelationships
3. The management systems used on the project (e.g. for HSEQ) and whether they are
formally accredited
4. The management of information on the project and the technologies including
software used.
You should evaluate the approaches used on the project against best practice as identified
in the literature and in the lectures given to support this module.
The report should be fully referenced in accordance with the Harvard Reference System.
Your report will be processed using Turnitin and you will be required to complete and sign a
plagiarism declaration.
The completed report must be submitted via Moodle (John Hanahoe’s Project Management
module) no later than 12noon on 1St September 2015.

Download
Google Translate
Bing Translator
Edit Online

DEPARTMENT OF BUILDING AND CIVIL ENGINEERING
Bachelor of Engineering (Hons) Civil Eng Year 4 2014/2015
PROJECT MANAGEMENT
REPORT FOR AUTUMN 2015
You are required to identify a substantial building or civil engineering project for which you
can access information. The project must have a minimum value of €5m (or equivalent in
local currency) and be currently under construction or very recently completed. You must
submit details of the project to John Hanahoe and not proceed without receiving approval.
You are required to produce a detailed report on the management approach and
management systems used for the chosen building or civil engineering project. The report
should be a minimum of 5,000 words (not including appendices) and address the following
1. The purpose, scope and extent of the building or civil engineering project including
the estimated construction cost, project duration and key milestones
2. The project contractual arrangement(s) and organisational structure(s) to include the
role of the client, the designer(s) and the construction team and their
interrelationships
3. The management systems used on the project (e.g. for HSEQ) and whether they are
formally accredited
4. The management of information on the project and the technologies including
software used.
You should evaluate the approaches used on the project against best practice as identified
in the literature and in the lectures given to support this module.
The report should be fully referenced in accordance with the Harvard Reference System.
Your report will be processed using Turnitin and you will be required to complete and sign a
plagiarism declaration.
The completed report must be submitted via Moodle (John Hanahoe’s Project Management
module) no later than 12noon on 1st September 2015.

You are required to be available for interview by Skype on the 7th, 8th or 9th of September
2015. The precise date and time of the Skype interview will be available to you from 2nd
September 2015 by contacting John Hanahoe. The interview forms an integral part of the
assessment and failure of the interview element may lead to overall failure of this
assignment.

John Hanahoe
June 2015

© NewOCR.com 2009 – 2015

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Live Chat+1-631-333-0101EmailWhatsApp