Posted: March 14th, 2015
Project Management Report on FiReControl project;
To Support Team: This is an assignment from the “Project Management for Business” module that I am currently taking. We are provided with a background FiReControl
project that failed to be implemented. We are required to write a report for the Department for Communities and Local Government to ensure that the organization learns
lessons from the mistakes made on this project using relevant project management theory. Please allocate this report to a writer professional on the Project Management
field.
1.
read through the assignment brief document uploaded for the detailed tasks of this assignment. Please make sure to analyze and evaluate two out of the three topics
mentioned in the document when writing the report.
2. As this is a report rather than a general essay, the report should be clearly structured with the following sections:
§ Executive summary
§ Introduction to the report
§ Brief background of the project
§ Main discussion on two topics
§ Conclusions
§ Recommendations
§ Reference list
3. Make sure the references are cited in Harvard Style.
4. The number of references cited should be around 16 including a minimum of 3 textbooks and 3 journal articles.
5. There is a maximum word limit of 2200 words (exclude references and executive summary) on this report, please do not exceed it.
PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂
Place an order in 3 easy steps. Takes less than 5 mins.