Posted: September 13th, 2017

STRATEGIC MANAGEMENT OF PROJECTS

Paper, Order, or Assignment Requirements

 

 

please find attached files the instructions and support files
kindly use Saudi Railway Company (SAR) for the assignment 
the company’s website :
www.sar.com.as

please use the following books in the references 
-The Wiley Guide to Managing Projects by Peter W. G. Morris, Jeffrey K. Pinto
– The Oxford Handbook of Project Management by Peter W. G. Morris, Jeffrey K. Pinto, Jonas Söderlund
– managing construction projects graham m winch 2nd edition
Your assignment should be approx 1500 words in length and typed

STRATEGIC MANAGEMENT OF PROJECTS COURSE ASSESSMENT 1 The final date for submission of this assessment without penalty is 23 February 2015 Assessment will be accepted for marking 14 days prior to the due date. Late Penalty System Please refer to the Student/Programme Handbook. This module is being delivered through the Manchester Blackboard virtual learning environment. All assessments must be submitted through Blackboard at: http://online.manchester.ac.uk If you have any technical difficulties using blackboard, please visit our support pages at: http://www.studentnet.manchester.ac.uk/blackboard Submitting your Assignment 1. Assignments should be typed, 10 or 11 point font size (Times Roman or similar if possible) double spaced with a 4 cm margin on the right side of the page with the page size specified as UK A4. All pages must be numbered. 2. Assignments should be submitted in either Microsoft Office and/or PDF format (.doc, .docx, .pdf etc.). File names should be kept simple and only contain alphanumeric characters (a-z0-9), spaces and underscores (e.g. Valid_filename_1.doc). Files with other characters such as apostrophes, brackets or commas may not be accessible by markers. 3. Assignments may be uploaded only once; substitutions are not permitted and students should therefore ensure that the version uploaded is their final submission. 4. Please ensure you include your student number and the assignment reference (SMOP/StudentNumber/Jan15/1) in all submitted assignments and that assignments are paginated. Failure to do this may lead either to a grade not being assigned or being wrongly assigned 5. If you are experiencing any difficulty in uploading your assignment to Blackboard, please email a copy of the assignment and a screenshot of the error message immediately to your local centre/Student Adviser. IMPORTANT: ALWAYS RETAIN A COPY OF YOUR ASSIGNMENT WARNING: Once submitted no substitute assignments will be allowedPlease ensure you include your student number and the assignment reference (SMOP/Student Number/Jan15/1) in all submitted assignments and that assignments are paginated. Failure to do this may lead either to a grade not being assigned or being wrongly assigned. STRATEGIC MANAGEMENT OF PROJECTS COURSE ASSESSMENT 1 Evaluate the Project Management Maturity of your organisation using the Portfolio, Programme, and Project Management Maturity Model P3M3. You only need to evaluate the PROJECT management maturity, not the programme or portfolio management maturity of your organisation. You should consult the P3M3 website: http://www.p3m3-officialsite.com/home/home.asp and research how to conduct the evaluation. Your assignment should be approx 1500 words in length and typed. Assignments significantly over this length may be penalised or returned for editing. Preparatory Readings 1. The P3M3 website and relevant downloads. 2. The Unit Workbook (available on Blackboard).

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Live Chat+1-631-333-0101EmailWhatsApp