Posted: September 16th, 2017

Strayer BUS375 all assignments

Assignment 1: Creating a Methodology

Due Week 2 and worth 100 points

Read the Chapter 2 Case titled “Creating a Methodology.” Write a one to two (1-2) page paper in which you:

1. Discuss factors about the corporate culture that were at play, and suggest central reasons why the executive staff waited as long as they had to consider the development of an enterprise project management methodology (EPM).

2. Recommend to both the senior executives (i.e., the company) and John Compton (i.e., the president) whether the project management office (PMO) should report to the chief information officer (CIO) or to someone else. Justify the response.

3. Use at least three (3) quality references. Note: Wikipedia and other Websites do not quality as academic resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

• Describe the key concepts, processes, and components of project management.

• Analyze the interrelationships among the principal elements (time, cost, resources) in the performance of project management.

• Evaluate the general systems factors affecting performance throughout the project life cycle.

• Use technology and information resources to research issues in project management.

• Write clearly and concisely about project management using proper writing mechanics.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Assignment 2: Project Motorcycles

Due Week 4 and worth 250 points

You are a project manager for a medium-sized manufacturer of motorcycle cruisers. The engines in motorcycle cruisers, like the ones you manufacture, are usually categorized by size rather than the number of cylinders. In the past, your company has successfully manufactured and marketed the best-selling of these fuel-efficient cruisers that occupy the middleweight class. The rather nebulous middleweight class comprises motorcycles broadly ranging in engine size from 500 cubic centimeters, or cc, to 1000 cc.

Executives at your company are now interested in motorcycles with larger motors and would eventually like to produce motorcycles in the touring class, specifically designed to excel at covering long distances with motors larger than 1100 cc. The proposed target market for these larger motorcycles consists of males between the ages of 35 and 60 in global markets. Price points for the larger motorcycles cover income ranges from $55,000 to $100,000. Management has decided that your company will meet the objectives stated herein within the next five (5) years. During the proposed changeover, the company will continue to manufacture the middleweight cruisers to serve its existing clientele.

Write a six to eight (6-8) page paper in which you:

  1. Select one (1) of the types of project organization that would suit the development of the larger touring class motorcycles. Outline the process steps that your company would take in order to develop the motorcycle. Provide a rationale for the response.
  1. Recommend one (1) strategy to the senior executives that the organization might use to balance short- and long-term needs. Specify the crucial resources that you would need as a project manager to run the existing business interests at the same time that the business changes to the production of touring class motorcycles.
  1. Suggest the project management leadership style that is most conducive to overseeing the operation of the business growth plan.
  2. Recommend at least three (3) risk mitigation strategies to address project plan details that might be forgotten or overlooked. Justify the selection.
  3. Use at least three (3) quality references. Note: Wikipedia and other Websites do not quality as academic resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

• Design an organizational structure, staff a project office, and establish a communications system to effectively manage projects.

• Analyze the role of executive management in the life of a project.

• Apply the project manager’s critical skills, in terms of project leadership, team building, time management, conflict management, and effective communication with executive sponsors, peers, team members, and project clients.

• Use technology and information resources to research issues in project management.

Assignment 3: Selling Executives on Project Management

Due Week 6 and worth 100 points

Read the Chapter 10 Case titled “Selling Executives on Project Management.” Write a one to two (1-2) page paper in which you:

1. Analyze the fundamental reasons why the executives in the case refused to listen to their own employees but were willing to listen to a consultant. Discuss the main reasons why the executives still seemed apprehensive even after the consultant’s presentation.

2. Imagine that you are the consultant from the case study. Speculate on three (3) strategies that you could employ to get the executives to understand your point of view and thus support your project management recommendations.

3. Use at least three (3) quality references. Note: Wikipedia and other Websites do not quality as academic resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

• Analyze the role of executive management in the life of a project.

• Apply the project manager’s critical skills, in terms of project leadership, team building, time management, conflict management, and effective communication with executive sponsors, peers, team members, and project clients.

• Use technology and information resources to research issues in project management.

• Write clearly and concisely about project management using proper writing mechanics.

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills, using the following rubric.

Points: 100 Assignment 3: Selling Executives on Project Management
Meets
Criteria Minimum
Unacceptable Expectations Fair Proficient Exemplary
Below 60% F 60-69% D 70-79% C 80-89% B 90-100% A
1. Analyze the Did not submit or Insufficiently Partially Satisfactorily Thoroughly
fundamental reasons incompletely analyzed the analyzed the analyzed the analyzed the
why the executives in analyzed the fundamental fundamental fundamental fundamental
the case refused to fundamental reasons why the reasons why reasons why reasons why the
listen to their own reasons why the executives in the executives the executives in the
employees but were executives in the the case in the case executives in case refused to
willing to listen to a case refused to refused to listen refused to the case listen to their
consultant. Discuss the listen to their own to their own listen to their refused to own employees
main reasons why the employees but employees but own listen to their but were willing
executives still seemed were willing to were willing to employees but own to listen to a
apprehensive even listen to a listen to a were willing to employees consultant.
after the consultant’s consultant. Did consultant. listen to a but were Thoroughly

Assignment 4: Project Motorcycles – The Comprehensive Project Plan

Due Week 8 and worth 300 points

Note:This assignment is a continuation from Assignment 2.

Write a six to eight (6-8) page paper in which you:

  1. Describe the project scope and project management plan. Align your plan to the overall strategy that you had recommended to the senior executives in Assignment 2.
  1. Analyze the type of staff that your company would need in order to make the manufacturing switch to motorcycles with larger motors.
  1. Prepare four (4) team-building strategies for handling the newly formed team. Discuss the manner in which the strategies that you have prepared may positively or negatively affect productivity within the company.

4. Analyze the role of the project manager that this project would require. Examine three (3) characteristics of an effective project manager that are relevant to this particular expansion project. Provide a rationale for the response.

5. Emphasize the importance of identifying critical path on projects and the manner in which one would allocate resources to all of the activities on the critical path.

6. Outline the elements of the Work Breakdown Structure (WBS) and pricing and costing strategy. Delineate the fundamental ways in which the project in question is composed.

7. Develop the following using designated project management software (e.g., Microsoft Project):

a. Work Breakdown Structure (WBS)

b. Gantt chart

c. Assigned Resources

Attach the project file that contains the items that you have developed.

8. Use at least three (3) quality references. Note: Wikipedia and other Websites do not quality as academic resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

• Apply the project manager’s critical skills, in terms of project leadership, team building, time management, conflict management, and effective communication with executive sponsors, peers, team members, and project clients.

• Evaluate the quality of planning throughout a project’s life cycle.

• Construct project schedules using network techniques and reports for both internal and external presentation.

• Use technology and information resources to research issues in project management.

• Write clearly and concisely about project management using proper writing mechanics.

Click here to have a similar A+ quality paper done for you by one of our writers within the set deadline at a discounted

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Live Chat+1-631-333-0101EmailWhatsApp