Posted: September 26th, 2016
Suppose you want to set a time standard for the baker making her specialty, square donuts. A work-sampling study of her on “doughnut day” yield the following results:
Time spent (working and idle) 320 minutes
Number of doughnuts 5,000
Working time 280 minutes
Performance 125%
Allowances 10%
What is the standard time per doughnut? Give a brief explanation?
Place an order in 3 easy steps. Takes less than 5 mins.