Posted: September 13th, 2015
Write a 1,400- to 2,100-word draft of the third section of your SDLC Final Project. Include the following:
• Testing process summary
o Define a test plan or script identifying major software functionality and hardware to be tested with required outcomes.
• Installation process and training plan summary
o Provide a timeline identifying specific steps, including training, and related resources required to implement the recommended system. Include a narrative explanation with a discussion of effects of project constraints—such as time, conversion method, and so forth—and a description of the recommended plan.
• Documentation plan summary
o Specify and explain each type of documentation, which is required for ongoing technical and user support of the proposed system.
Place an order in 3 easy steps. Takes less than 5 mins.