Posted: December 7th, 2013
Metrics used in IT industry and its effectiveness
A
path breaking research in the area of Metrics used in IT industry and its effectiveness- Developing new metrics for measuring the project triple constraints of cost , schedule and scope.
Baker, B. (1993). The project manager and the media: Some lessons from the
stealth bomber program.
Project Management Journal, 24(3), 11-14.
Cleland, D. I., & King, W. R. (1983). Systems analysis and project management. New York: McGraw-Hill.
Hartley, J. R. (1992). Concurrent engineering. Cambridge, MA: Productivity Press.
It is the author’s responsibility to obtain permission to include (or quote) copyrighted material, unless the author owns the copyright. Use the Wiley permission form, which is available at the
Manuscript Central site.